solarpower-India
Friday, May 26, 2017
Thursday, September 29, 2016
Solar Assignments
2.
EPC Tender document
3.
Detailed Project report
4.
Site Evaluation
5.
Pre Feasibility Report
6.
Selection of EPC
7.
Assistance in EPC Tender Processing
8.
Evaluation of Tender
9.
Bankable Detailed Project Report
10.
Carbon Credit Advisory Services
11.
Techno Economic Viability Report
12.
Lenders Engineer Services
13.
Detailed Feasibility Report
14.
Review of Detailed Engineering
15.
PMC Services
16.
Third Party certification services
17.
REC Syndication
18.
Supervision of Project Execution
19.
Legal Services
20.
Evaluations of Tenders and negotiations
21.
Bid Process Management
22.
Assistance in Land Due Diligence
23.
Assistance in registration with MNRE as Channel
Partner
14.Detailed Engineering Services
14.Detailed Engineering Services
Wednesday, September 28, 2016
Hindustan Power awarded 'Best Solar Developer'
- Awarded by IPPAI
- Hindustan Clean energy: India’s first 5 MW solar farm along with Asia’s first 30 MW farm.
- CEO:Rajyawardhan Ghei
- IPPAI Director General:Harry Dhaul
Tuesday, September 27, 2016
WTC Mumbai Installs city's largest rooftop plant of 250KW
- Grid Tied with netmetering scheme under BEST(Brihanmumbai Electric Supply and Transport).
- EPC:Maxwell Solar and Wind Energy Private Limited
- Comissioned date: Sep 16
- Units:3L annually
- Area:25000sft
- No of modules: 808, 310wp -multi crystalline technology-Waree Energies Ltd
- Generate :900kwh daily
- Initial cost:1.75Crores
- Inverters: SMA Solar Technologies
31.5 MW Solar Power Plant
Location: Mirpur Kalan in Mansa district
investment: 200cr
area: 173 Acres(Land taken for lease for 50,000 per acre anually)
Installer: Bhanu Energy Infrastructure and Power Limited
Comission date:29-sep-2016
Technology:
investment: 200cr
area: 173 Acres(Land taken for lease for 50,000 per acre anually)
Installer: Bhanu Energy Infrastructure and Power Limited
Comission date:29-sep-2016
Technology:
- Crystalline Silicon Photovoltaic Module
- Fixed Structure
- 1, 22,328 modules (5097 of Strings) and
- Bonfiglioli (8+8=16) inverters.
Madhya Pradesh new Rooftop policy
- Targets: 2.2GW Rooftop by 2022
- residential consumers will be eligible for 30% subsidy
- government buildings shall be eligible for a higher subsidy of 45%.
- buildings owned by government agencies could get a subsidy of as much as 50%.
- but modules should be made in india
- Rooftop draft policy MP
Belectric to develop 104MW in Telangana
- Belectric :A german EPC Company
- no of plants: 6
- saving:80,000 tons of CO2 savings a year
- Think energy partner will own projects once completed
- Belectric India MD: Yogesh Dabhade
- Comissioning: in first quarter of 2017
Monday, September 26, 2016
Suzlon plans to develop Hybrid wind-solar energy projects with energy storage
- project developers: Suzlon Energy
- Chief Technology Officer:Duncan Koerbel
- soon become first in India to set up projects where solar, wind, and storage capacities will be integrated.
- last year Ministry of New & Renewable Energy issued a draft policy for setting up solar-wind hybrid projects.
Haryana started online application to avail subsidy
- now Applicants Can get sbsidy on solar panels
- Portal: hareda.gov.in
- Should be submitted before installation only.
- eligible for 30% of Benchmark price fixed byHREDA or 20,000per KW whichever is less.
- Rameshwar Singh Jangir, Project officer, HAREDA, Gurgaon
- Benchmark prices are set like this
- 75000 for slab up to 10KW
- 68000 for 10-50KW
- 62000 for 50KW and above
Saturday, September 24, 2016
Thursday, September 22, 2016
Adani Group launches world’s largest solar power plant in Tamil Nadu
- Capacity-648MW
- Location-Kamudhi ,Ramanathapuram, Tamilnadu
- Comissioned date- sep 21,2016
- Area-5000Acres
- Cost-4550Crore
- Man Power-8500
- Duration-8Months i.e.,11MW in a day
- Foundations-3,80,000
- Modules-25Lakh
- Structure-27000m
- Inverters-576
- Transformers-154
- Cable-6000km
- Substation-400kv Tantransco
- power sale-7.01/unit
world's largest solar park comissioning first phase soon in Karnataka
- Location: Pavagada,Tumakuru Dist, 180km from Banglore
- Capacity: 2000MW
- operational of First phase 600MW by April-May 2017. (PPA with NTPC)
- Compare with California Topaz Solar farm of 550 MW AC.
- Area: 13000 Acres- 21,000 per acre for lease from farmers
- Completes by September-2018
Wednesday, September 21, 2016
Solar Gamera Helicoptor now solar powered
The year 2016 seems to be a progressive one for the aviation sector fueled by solar energy. The Solar Impulse 2 had completed its sixteen months journey around the world; it was the first kind of fuel-less travel.
Now it is the turn of a motivated team of technical savvy engineers further improvised the journey with the successful launch of solar energy powered piloted helicopter.
Their helicopter named “Solar Gamera” can only travel short distances. But youngsters are confident that the longer versions of travel are on flow. They claim the day marks of historic importance in the arena of rotary blade aviation along with the green aviation sector.
The craft occupying a space of 100 Sq.Ft , stands to be majestic and huge.
So far, the new invention was able to fly for just 9 seconds above a foot from the earth. The trial flying took place at the grounds of University of Maryland.
Each small panel was individually purchased holding exclusive monocrystalline solar cells. Then, the team developed foam backings, and built the huge solar panel that fuels the craft.
The innovative project progressed exponentially from its initial creation of man-powered craft. Still the challenges of big shape and sole reliant on solar energy need to be efficiently addressed.
Wonderla amusement park installed 500kwp
- Wonderla amusement park in hyderabad installed 500kwp solar.
- location: Outer Ring Road, Exit No. 13, Ravirala, Hyderabad, Telangana 501510
- MD:Arun Chittilappilly
- first amusement park in India to go solar.
- provides Half of power requirement for 43 rides.
- in future one more 500kw plant to install..to completely depend on solar power.
- inagurated on 20thsep 2016 by Jayesh Ranjan, IAS secretary.
- Generates-2000kwh daily.
- daily consumption-10000kwh per day
- download press release here
Tuesday, September 20, 2016
Greenko to buy SunEdisons Indian assets for $315 million
Sun Edsion US based company, sells its Indian portfolio to Hyderabad based Greenko Energy Holdings for $315 million($30 million equity value and $280 million debt.)-cheaper rate
Greenko which already has its presence in hydro, wind, biogas and natural gas sectors, now also adds solar power to its kitty.
Previously lost a bid to acquire solar business of Welspun India Limited.
Greenko which already has its presence in hydro, wind, biogas and natural gas sectors, now also adds solar power to its kitty.
Previously lost a bid to acquire solar business of Welspun India Limited.
ISRO Study says Gujarat receives highest levels of Solar Radiation than Rajasthan
ISRO clarified that Gujarat recieves highest levels of Solar Radiation than Rajasthan.
First place-kutch in Gujarat
Second place- Hayat Nagar in Hyderabad
Third Place- Sriharikota
Fourth Place- Jaisalmer
First place-kutch in Gujarat
Second place- Hayat Nagar in Hyderabad
Third Place- Sriharikota
Fourth Place- Jaisalmer
Monday, September 19, 2016
Vikas Bhawan is now solar powered with 75kwp
Location: Uttar Pradesh
Gid Interactive RooftopPlant
Units-1 lakh units per year
Savings-8 lakhs on Bill
Planning to install 100kwp on comissioner office
Gid Interactive RooftopPlant
Units-1 lakh units per year
Savings-8 lakhs on Bill
Planning to install 100kwp on comissioner office
Saturday, September 17, 2016
Hyderabadi Man Drove from India to UK on a Solar Auto Rikshaw With Support of Telangana Tourism
Naveen Rabelli completed journey From Bangalore to UK...
Over all distance 14200 km
Crossed countries: 11
towns: 100
http://www.solartuktuk.com/
http://observers.france24.com/en/20160921-indian-trip-solar-tuk-tuk-auto-rickshaw
Green Incubation Center In Telangana
First of its kind in the country Green Incubation center (Green Hub) is going to set by Telangana government aimed at promoting green and clean technologies.The newly carved out state of Telangana has tasted success with the T-Hub, a tech start-up centre, and is now in the process of finalising the new hub , Arvind Kumar, Principal Secretary Energy, said.
The centre will be set up in EPTRI (Enviroment Protection Training and Research Institute) campus and some international players in the innovation space will be roped into to back the initiative. The State is also seeking to access Green Energy Fund apart from the State extending necessary support, he said.
Ref:http://www.thehindubusinessline.com/news/national/green-incubation-centre-soon-for-cleantech-firms-in-telangana/article9018234.ece
The centre will be set up in EPTRI (Enviroment Protection Training and Research Institute) campus and some international players in the innovation space will be roped into to back the initiative. The State is also seeking to access Green Energy Fund apart from the State extending necessary support, he said.
Ref:http://www.thehindubusinessline.com/news/national/green-incubation-centre-soon-for-cleantech-firms-in-telangana/article9018234.ece
MYTRAH Energy set to target at 1400MW Solar Power Plants by next year
The Summary of Mytrah Projects:
1) Wind Power plants completed as on June 2016: 877 MW
2) Wind Power target by this year 2016: 1000 MW
3) Solar PV bagged projects of 422MW
4) Solar Projects got finance for :237MW
5) Target of solar by end of next year 1400MW
Updating the company performance for the first six months ended June 30, Ravi Kailas, Chairman of Mytrah Energy, said: “Our new solar business has made sound progress during the period and has secured long term PPAs for 422 MW to date, of which we have achieved financial closure for 237 MW. The company has also signed contracts with suppliers for 172 MW solar modules and 150 MW solar inverters. We look forward to the solar projects progressing through to construction once regulatory and land approvals are completed.”
Ref: http://www.thehindubusinessline.com/companies/mytrah-energy-solar-power/article9108066.ece
1) Wind Power plants completed as on June 2016: 877 MW
2) Wind Power target by this year 2016: 1000 MW
3) Solar PV bagged projects of 422MW
4) Solar Projects got finance for :237MW
5) Target of solar by end of next year 1400MW
Updating the company performance for the first six months ended June 30, Ravi Kailas, Chairman of Mytrah Energy, said: “Our new solar business has made sound progress during the period and has secured long term PPAs for 422 MW to date, of which we have achieved financial closure for 237 MW. The company has also signed contracts with suppliers for 172 MW solar modules and 150 MW solar inverters. We look forward to the solar projects progressing through to construction once regulatory and land approvals are completed.”
Ref: http://www.thehindubusinessline.com/companies/mytrah-energy-solar-power/article9108066.ece
Wednesday, September 14, 2016
First Artificial Photosynthesis System To Produce Fuel
Solar energy can be directly converted into the universal storage medium of hydrogen.
Berlin: Scientists in Germany have developed the first complete and compact artificial photosynthesis system that uses solar power to split water and produce hydrogen fuel.
Solar energy can be directly converted into the universal storage medium of hydrogen. This process was first investigated in the 1970s, but has only begun to attract increasing attention in recent years.
Research has focused on materials science for new absorber materials and catalysts to further improve efficiency.
Read more: http://www.pioneernews.in/2016/09/13/first-artificial-photosynthesis-system-to-produce-fuel/
Subscribe to:
Posts (Atom)