Liaosining
- Reviewing the bid document
- Tendering process
- PPA formality & Evacuation approval
- Land aquisition
- Land conversion certificate
- NOC from Panchayat
- NOC from Pollution control and other NOCs
- Approval from NEDCAP
- Approval from MNRE
- Customs and Excise exemption certificate from MNRE
- Company registration
- Line / Bay erection approval from DISCOM
- Synchronization approval
- Metering approval
- CEIG approval
Pre EPC
- Survey
- Soil test
- Financial modeling
- Detailed project report
- Financial closure
- EPC contractor selection
EPC
Civil
- Land leveling
- Design of mounting structure
- Design of foundation
- design of earthing pit
- Design of cable trenches
- Design of sewage facility
- Design for paths between arrays cleaning system
- Design of fire systen
- Design of control room
- Design of Site office
- Design of Security rooms
- Design of roads for transport in and out
- water treatment plant sizing / borewell
- Fencing design
Electrical
- Shadow analysis
- Inverter sizing
- Cable sizing
- Transformer design
- Pannel selection
- preparation of SLD
- Surge protection design
- Lightning protection design
- Earthing design
- Plant Illumination design
- Distribution board design
- Switchyard design
- SCADA design
- Auxiliary T/F & Distribution board design
- Security system design
- Auxiliary power consumption design
- Evacuation design
Procurement
- Solar modules
- Supply for required civil works
- Inverters
- mounting structures / Trackers
- monitoring systems
- cables and connectors
- LT & HT panels
- Junction box, Distribution board
Construction
- Fixing modules
- Equipment erection
- Monitoring system
- DC & AC cable
- Earthng and lightning
- Approach
- water supply
- water management system
- yard lightning
- control room
- inverter room
- Boundary fencing
- Cable trenches
- fixing mounting structures